Skip to content

Sizing the First Purchase Order for a New Online Store

A simple way to size your first inventory order: bridge the learning window and lead time, then cap it by cash. Includes a hypothetical worked example.

By
Ajansia Editorial
Updated
Reading time
9 min read

Reviewed against primary sources. How we work

On this page
  1. 01Your first order is a test, not a bet
  2. 02The bridge formula
  3. 03A worked example (hypothetical)
  4. 04Cash is the real ceiling
  5. 05Where the demand guess comes from
  6. 06Split the order across SKUs unevenly
  7. 07Questions to put to your supplier
  8. 08Where first orders go sideways
  9. 09Take one step today
  10. ··Frequently asked questions

Week three, ads still running, shelves empty. That is the nightmare of ordering too little. The opposite nightmare is a spare room full of cardboard that used to be your savings. Most first-order advice cures one and feeds the other, so size the order around a question you can actually answer: how long until you can safely place the next one?

It has a number attached. One sheet of paper is enough.

Your first order is a test, not a bet

A first order is not a forecast of your year. With no sales history, an annual forecast is a guess dressed in a spreadsheet. What you do have is a supplier lead time, a cash limit and a rough sense of the low and high end of demand.

Treat the order as the cheapest way to buy information. Big enough to keep the shop open until reorder data exists; small enough that a wrong guess costs a lesson rather than the business.

The bridge formula

The method needs three inputs and one multiplication.

  1. Learning window. How many days of real sales you want before you place the second order. As a rule of thumb, three to four weeks suits products that sell steadily, and slow or lumpy items need longer.
  2. Second-order lead time. The days between placing an order and having sellable stock on your shelf. Count production, shipping, customs holds and the time to check and shelve the goods.
  3. Expected daily sales. Your base case, not your hope.

The first order quantity is roughly: (learning window + second-order lead time) x base-case daily sales. Round up to the supplier’s minimum order quantity or case size, then check the result against your cash limit.

The first batch has to carry you through the learning window and through the wait for the second batch. Anything beyond that is a bet on demand you have not yet seen.

A worked example (hypothetical)

Say a founder launches a candle brand with three scents. Landed cost is $9 per unit, meaning the price paid to the supplier plus freight and duties. The retail price is $28. Production takes 30 days and shipping another 12, so the lead time is 42 days. The founder wants 30 days of sales data before reordering.

The founder sketches three demand scenarios per scent:

Scenario Units per month Units per day
Pessimistic 10 0.33
Base 25 0.83
Optimistic 60 2.0

The bridge is 30 + 42 = 72 days. At the base case of 0.83 units a day, that is about 60 units per scent, or 180 units across three scents. At $9 each, the order costs $1,620.

Now stress it. If the pessimistic case is true, 60 units per scent lasts roughly six months, and the founder has $1,620 sitting on shelves for half a year. Uncomfortable, not fatal. Flip to the optimistic case and the first batch is gone in about 30 days, well before the second order can arrive. That leaves a gap of roughly six weeks with nothing to sell. The gap is the price of ordering conservatively, and cash decides whether the founder pays it.

Cash is the real ceiling

Run the cash check before you fall in love with the formula. Three blunt questions do it.

  • How much can you tie up in stock without missing rent, payroll or ad spend for the next two months?
  • What does the order cost if the pessimistic scenario happens and nothing sells for ninety days?
  • Is there a supplier payment term, such as a deposit with the balance due on shipment, that changes when cash leaves?

A workable rule of thumb: order the lower of two numbers, what the bridge formula says and what you could afford to see sit unsold for a quarter. Say the formula gives $4,000 (a made-up figure) and the dead-stock number is $2,500. Order $2,500 worth and accept the stockout risk. A stockout is recoverable. A cash crunch in month two often is not.

Where the demand guess comes from

Someone, a supplier or a partner or your own accountant, will ask you to justify the base case. A store with no history has three honest sources.

Comparable products

Find similar items from other shops, marketplaces or your own category experience, and estimate how fast they move at a similar price. Public review counts on marketplace listings are a very rough proxy for relative volume. They are noisy. Use them to rank your SKUs against one another, never to produce a precise number.

Traffic times conversion

If you have an audience or planned ad budget, multiply expected visits by a conversion rate. Conversion rates vary widely by category and traffic source, so check current benchmarks before relying on one, and lean low. As a hypothetical, say 3,000 visits a month at a 1 percent conversion rate gives 30 orders. If your list is mostly friends and family, assume the real number is smaller than it feels.

Presales and waitlists

The strongest evidence is money or intent. A waitlist of 200 emails does not mean 200 sales, though it narrows the range. Presales narrow it far more. They are real purchases, and the cash helps pay for the order itself.

Split the order across SKUs unevenly

New stores often divide the first order evenly: 60 of each scent, 60 of each size. It feels fair. It is almost always wrong, because one product pulls ahead and you cannot know which.

A better split, as a rough rule of thumb, puts the majority of units behind the two or three variants you believe in most and keeps the rest thin. Order fewer of the odd sizes and colors. Sixty candles in a shade nobody asked for are a very specific kind of disappointment.

If the supplier’s minimum order quantity forces you above the number you wanted, look at it again before agreeing. Sometimes a smaller number of SKUs with deeper stock beats a wide catalog with shallow stock, because a wide catalog multiplies your stockout and dead-stock chances at the same time.

Questions to put to your supplier

Ask the questions that change the math before you place anything.

  • What is the minimum order quantity per SKU, and is there a lower one for a sample run?
  • What is the realistic lead time on a repeat order, as opposed to the first one?
  • Do prices drop at higher quantities, and by how much? Compare the saving with the cost of carrying the extra units.
  • Can part of the order ship by air so you cover launch, with the rest by sea?

The last question is worth more than it looks. If you can pay extra freight on a small portion to launch on time and ship the bulk the cheaper way, you cut both the stockout risk and the cash tied up in the first batch.

A message worth sending

Plain language works. Something like this, adjusted for your product:

“A first order of 60 units per variant across three variants is planned, with a possible repeat order roughly 30 days after delivery. Please confirm the minimum order quantity per variant, the production time and shipping time for the first order, and whether a repeat order would be faster once the tooling or setup is done. Please also quote a price for 120 units per variant for comparison.”

Notice that it announces a possible repeat. Suppliers often give more attention to customers who look likely to return, and the sentence costs nothing. It is also an honest statement of your plan.

The first six weeks after delivery

The first order is only half the plan. The other half is a short routine for the first six weeks, and it costs nothing.

Count the goods on arrival against the purchase order and note any shortfall or damage the same day, while claims are still easy to make. Photograph anything broken. Then record the date, quantity and landed cost per unit so you have a baseline to compare later orders against.

In week two, compare actual daily sales with the base case. If you are running at half the base case, stop all optional spending on that SKU and look at the listing, the price and the traffic before blaming the product. If you are running at double, call the supplier now, not at the review date, and ask whether a partial air shipment or an early second order is possible. A supplier that hears about a reorder six weeks before you run out is a happier supplier than one that hears about it after.

By the review date you want three numbers per SKU: units sold, units left and days of stock remaining at the recent pace. If days of stock remaining is lower than the lead time, you are already late and the second order should include a freight upgrade. If it is more than double the lead time, skip the order and put the cash somewhere useful.

Where first orders go sideways

Ordering for the optimistic scenario. The optimistic case is the one you remember. The base case is the one you should pay for.

Ignoring landed cost. Freight, duties, packaging and inspection costs move the unit price. Using the factory price underestimates the cash you need. Check current duty rates for your product and route rather than assuming.

Skipping a review date. Write down the date you will look at sales and decide on the second order. Without it, the first order quietly becomes a habit, and the learning window stretches until you run out.

Forgetting returns and damage. A small buffer for breakage or returns is reasonable on fragile items. A large one signals a quality problem to settle with the supplier.

Treating the order as final. The first purchase order is the cheapest test you will ever run. Adjust the second one hard in either direction once data arrives.

Take one step today

Open a sheet and write down three numbers for your best-guess product: lead time in days, base-case daily sales, and the amount of unsold stock you could live with for ninety days. Multiply, compare, and order the smaller of the two answers. Then put the review date in your calendar before the goods arrive.

This article is general information about inventory planning, not financial advice.

Frequently asked questions

How many units should a brand new store order?

Enough to cover your learning window plus the lead time of a second order at base-case daily sales, rounded up to the supplier minimum and capped by cash. For many small stores that means a few weeks to a few months of expected sales, not a year.

Is it better to order too much or too little?

Too little is usually the cheaper mistake early on, because a stockout is recoverable and a cash crunch often is not. Order too little only if you have a plan, such as a faster second order or presales, to cover the gap.

What if the supplier minimum is bigger than my formula result?

Look at fewer SKUs with deeper stock, ask for a sample or pilot run price, or find a supplier with lower minimums. Accepting a large minimum only makes sense if you could comfortably carry the whole order unsold for a quarter.

Should I use presales to size the order?

Yes where possible. Presales are real purchases, they narrow your demand range, and the cash helps fund the order. Be honest with customers about ship dates.

How do I know my demand guess is any good?

You do not, which is why the order is built from three scenarios and capped by cash. Set a review date and let the first weeks of sales replace the guess.

Sources1
  1. shopify.com/blog/landed-cost

Links open the original pages. Spotted an error? Tell us and we will check it.

Saved guides

    Nothing saved yet. Use the Save button on any guide and it will wait here, in this browser only.

      Browse a topic

      ↑↓ moveEnter openEsc close